Cable-tray manufacturer
- Commerce
KSA · Founder-led operations study · 2015
27%
of the line's total cost was the cost of poor quality, and the largest part never appeared in the accounts
A 14-day lead time, cut to 6.5
- Challenge
- Quality costs were tracked as inspection and scrap. Lost sales, which the accounts don't record, were the biggest single cost (43%).
- Result
- The hidden cost of quality made visible. The line acted on it: 8 welding robots were introduced, and waiting time fell from 13 days to 6.
01 / 02
CommerceFounder-led · KSA
KSA · Founder-led operations study · 2015
Commerce: Founder-led · KSA
- Approach
- Cost-driver analysis across 5 quality-cost categories, then value stream mapping of the line in its current and future states.
- Also delivered
- Labour per piece cut from 19.5 to 10.5 minutes on average.