An Asian LED and control maker · KSA landmark tower · 2026
3
gates to clear within 45 days before committing: sponsor access, a scope that can still be bought, and space in the façade drawings
A way into a landmark façade before the panels freeze
- Challenge
- The façade contract was already awarded. A late supplier had to fit inside another firm's panels, schedule and approval chain.
- Result
- A go or no-go rule the client could act on within 45 days, and a first-contact pack built to remove the façade contractor's biggest worry: late changes.
01 / 02
CommerceEntry dossier · KSA
An Asian LED and control maker · KSA landmark tower · January 2026
Commerce: Entry dossier · KSA
- Approach
- Mapped who decides, who influences and who approves. Ranked 3 ways in, set out the approval chain and drew up a KSA compliance checklist (SBC, SABER, Civil Defence).
- Also delivered
- A risk register, a local partner shortlist, 6 first moves, and checkpoints at 10, 30 and 60 days.