An Asian LED and control maker · KSA landmark tower · 2026

3

gates to clear within 45 days before committing: sponsor access, a scope that can still be bought, and space in the façade drawings

A way into a landmark façade before the panels freeze

Challenge
The façade contract was already awarded. A late supplier had to fit inside another firm's panels, schedule and approval chain.
Result
A go or no-go rule the client could act on within 45 days, and a first-contact pack built to remove the façade contractor's biggest worry: late changes.

01 / 02

  1. Chart: the six sign-offs between a sample and the site, from design acceptance to commissioning
  2. Decision map by role: who decides, who influences and who approves on a landmark tower

CommerceEntry dossier · KSA

An Asian LED and control maker · KSA landmark tower · January 2026

Commerce: Entry dossier · KSA

Approach
Mapped who decides, who influences and who approves. Ranked 3 ways in, set out the approval chain and drew up a KSA compliance checklist (SBC, SABER, Civil Defence).
Also delivered
A risk register, a local partner shortlist, 6 first moves, and checkpoints at 10, 30 and 60 days.